295. A budget which is prepared in a manner so as to give the budgeted cost for any level ofactivity is known as – A. Master budget B. Zero base budget C. Functional budget D. Flexible budget
295. A budget which is prepared in a manner so as to give the budgeted cost for any level ofactivity is known as – A. Master budget B. Zero base budget C. Functional budget D. Flexible budget
Share
D.Flexible budget