1. In which of the following stages contract documents are prepared? A. Planning stage B. Briefing stage C. Construction stage D. None of the above Answer» D. None of the above 2. In which of the following stages specifications are ...
Quearn Latest Articles
Construction Management Solved MCQs
Quearn1. In time-cost optimization of a project, crashing is done. A. On all the activities B. On all the activities lying on the critical path C. Only on activities lying on the original critical path and having flatter costslopes D. ...
Concrete Technology and Design Solved MCQs
Quearn1. The temperature reinforcement in the vertical slab of a T-shaped R.C. retaining wall is A. not needed B. provided equally on inner and front faces C. provided more on inner face than on front face D. provided more on ...
Software Engineering Solved MCQs
Quearn1. Software Engineering: A. is a set of rules about developing software products B. has been around as a discipline since the early 50’s C. started as a response to the so-called ‘software crisis’ of the late 90’s D. is ...
Software Development Methodologies Solved MCQs
Quearn1. Relational schemas and other metadata about relations are stored in a structure called the ____________ A. Metadata B. Catalog C. Log D. Data Dictionary Answer» D. Data Dictionary 2. .A data dictionary is created when a __________ created. A. ...
Analysis and Design Tools Solved MCQs
Quearn1. Which of these states the goal of engineering design analysis? A. To understand an engineering design problem B. To provide an solution for a given problem C. All of the mentioned D. None of the mentioned Answer» A. To ...
Introduction to Software Engineering Solved MCQs
Quearn1. What is the major advantage of using Incremental Model? A. Customer can respond to each increment B. Easier to test and debug C. It is used when there is a need to get a product to the market early ...
Requirement Analysis Solved MCQs
Quearn1. ————- these are systems which are commissioned by a particular customer. A. Generic Product B. Customized product C. Product D. None of these Answer» D. None of these 2. ————- component should be designed and implemented so that it ...
Introduction to System Concept Solved MCQs
Quearn1. ______ is an orderly grouping of independent components linked togetheraccording to a plan to achieve a specific objective or goal. A. System B. Software C. Subsystem D. Physical system Answer» A. System 2. A —————is a set or group ...
Concrete Technology Solved MCQs
Quearn1. Processes of cement manufacturing is…….? A. Wet process B. Dry process C. Semi-dry process D. All of above Answer» D. All of above 2. After 28 days of curing, cement gains have been found to have hydrated to a ...