1. | What is the major advantage of using Incremental Model? |
A. | Customer can respond to each increment |
B. | Easier to test and debug |
C. | It is used when there is a need to get a product to the market early |
D. | Easier to test and debug & It is used when there is a need to get a product to the market early |
Answer» A. Customer can respond to each increment |
2. | The spiral model was originally proposed by |
A. | IBM |
B. | Barry Boehm |
C. | Pressman |
D. | Royce |
Answer» B. Barry Boehm |
3. | The spiral model has two dimensions namely _____________ and ____________ |
A. | diagonal, angular |
B. | radial, perpendicular |
C. | radial, angular |
D. | diagonal, perpendicular |
Answer» C. radial, angular |
4. | How is WINWIN Spiral Model different from Spiral Model? |
A. | It defines tasks required to define resources, timelines, and other project related information |
B. | It defines a set of negotiation activities at the beginning of each pass around the spiral |
C. | It defines tasks required to assess both technical and management risks |
D. | It defines tasks required to construct, test, install, and provide user support |
Answer» B. It defines a set of negotiation activities at the beginning of each pass around the spiral |
5. | Identify the disadvantage of Spiral Model. |
A. | Doesn’t work well for smaller projects |
B. | High amount of risk analysis |
C. | Strong approval and documentation control |
D. | Additional Functionality can be added at a later date |
Answer» A. Doesn’t work well for smaller projects |
6. | Spiral Model has user involvement in all its phases. |
A. | True |
B. | False |
C. | all |
D. | none |
Answer» B. False |
7. | How is Incremental Model different from Spiral Model? |
A. | Progress can be measured for Incremental Model |
B. | Changing requirements can be accommodated in Incremental Model |
C. | Users can see the system early in Incremental Model |
D. | All of the mentioned |
Answer» A. Progress can be measured for Incremental Model |
8. | If you were to create client/server applications, which model would you go for? |
A. | WINWIN Spiral Model |
B. | Spiral Model |
C. | Concurrent Model |
D. | Incremental Model |
Answer» C. Concurrent Model |
9. | A company is developing an advance version of their current software available in the market, what model approach would they prefer ? |
A. | RAD |
B. | Iterative Enhancement |
C. | Both RAD & Iterative Enhancement |
D. | Spiral |
Answer» C. Both RAD & Iterative Enhancement |
10. | One can choose Waterfall Model if the project development schedule is tight. |
A. | True |
B. | False |
C. | all |
D. | none |
Answer» B. False |
11. | Spiral Model has high reliability requirements. |
A. | True |
B. | False |
C. | all |
D. | none |
Answer» A. True |
12. | RAD Model has high reliability requirements. |
A. | True |
B. | False |
C. | all |
D. | none |
Answer» B. False |
13. | If you were a lead developer of a software company and you are asked to submit a project/product within a stipulated time-frame with no cost barriers, which model would you select? |
A. | Waterfall |
B. | Spiral |
C. | RAD |
D. | Incremental |
Answer» C. RAD |
14. | Which of the following life cycle model can be chosen if the development team has less experience on similar projects? |
A. | Spiral |
B. | Waterfall |
C. | RAD |
D. | Iterative Enhancement Model |
Answer» A. Spiral |
15. | Selection of a model is based on |
A. | Requirements |
B. | Development team & Users |
C. | Project type and associated risk |
D. | All of the mentioned |
Answer» D. All of the mentioned |
16. | Which of the following life cycle model can be chosen if the development team has less experience on similar projects? |
A. | Spiral |
B. | Waterfall |
C. | RAD |
D. | Iterative Enhancement Model |
Answer» A. Spiral |
17. | Which two models doesn’t allow defining requirements early in the cycle? |
A. | Waterfall & RAD |
B. | Prototyping & Spiral |
C. | Prototyping & RAD |
D. | Waterfall & Spiral |
Answer» B. Prototyping & Spiral |
18. | A model that is the demo implementation of the system. |
A. | waterfall |
B. | prototype |
C. | incremental |
D. | agile |
Answer» B. prototype |
19. | Maintenance is the final phase in waterfall model. |
A. | True |
B. | False |
C. | all |
D. | none |
Answer» A. True |
20. | A stage in which individual components are integrated and ensured that they are error-free to meet customer requirements. |
A. | Coding |
B. | Testing |
C. | Design |
D. | Implementation |
Answer» B. Testing |
21. | Methodology in which project management processes were step-by step. |
A. | Incremental |
B. | Waterfall |
C. | Spiral |
D. | Prototyping |
Answer» B. Waterfall |
22. | ER diagram is a ————t |
A. | Design |
B. | Coding |
C. | Testing |
D. | None of above |
Answer» A. Design |
23. | ER diagram is a ________of the database system which provides high level conceptual data model and supports the users perception of the data. |
A. | Graphical representation |
B. | Hierarchical representation |
C. | Both of these |
D. | None above these |
Answer» A. Graphical representation |
24. | ________ is an object in to real world that is distinguishable from all other objects |
A. | Entity |
B. | Attribute |
C. | Both |
D. | None |
Answer» A. Entity |
26. | Each entity has a set of _____________ |
A. | Entity |
B. | Attribute |
C. | Row |
D. | None |
Answer» B. Attribute |
27. | ______ attributes cannot be divided into subparts |
A. | Simple |
B. | Composite |
C. | Single valued |
D. | Multivalued |
Answer» A. Simple |
28. | _________ attributes can be divided into subparts. |
A. | Simple |
B. | Composite |
C. | Single valued |
D. | Multivalued |
Answer» B. Composite |
29. | __________entity does not have a value for an attribute. |
A. | Null |
B. | Composite |
C. | Single valued |
D. | multivalued |
Answer» A. Null |
30. | ________ represent entity set. |
A. | Ellipses |
B. | Rectangles |
C. | Diamonds |
D. | Lines |
Answer» B. Rectangles |
31. | ___________ represent attributes |
A. | Ellipses |
B. | Rectangles |
C. | Diamonds |
D. | Lines |
Answer» A. Ellipses |
32. | ___________represent relationship set. |
A. | Ellipses |
B. | Rectangles |
C. | Diamonds |
D. | Lines |
Answer» C. Diamonds |
33. | ___________represent multi-valued attribute. |
A. | Double ellipse |
B. | Dashed ellipse |
C. | Diamonds |
D. | Lines |
Answer» A. Double ellipse |
34. | _________ represent derived attribute. |
A. | Double ellipse |
B. | Dashed ellipse |
C. | Diamonds |
D. | Lines |
Answer» B. Dashed ellipse |
35. | _________represent weak entity set. |
A. | Double ellipse |
B. | Dashed ellipse |
C. | Double rectangle |
D. | Lines |
Answer» C. Double rectangle |
36. | A _________ is a decision support tool that uses a tree-like graph or model of decisions and their possible consequences, including chance event outcomes, resource costs, and utility. |
A. | Decision tree |
B. | Graphs |
C. | Trees |
D. | Neural Networks |
Answer» A. Decision tree |
37. | What is Decision Tree? |
A. | Flow-Chart |
B. | Structure in which internal node represents test on an attribute, each branch represents outcome of test and each leaf node represents class label |
C. | Flow-Chart & Structure in which internal node represents test on an attribute, each branch represents outcome of test and each leaf node represents class label |
D. | None of the mentioned |
Answer» C. Flow-Chart & Structure in which internal node represents test on an attribute, each branch represents outcome of test and each leaf node represents class label |
38. | Decision Tree is a display of an algorithm. |
A. | True |
B. | False |
C. | all |
D. | none |
Answer» A. True |
39. | Choose from the following that are Decision Tree nodes? |
A. | Decision Nodes |
B. | End Nodes |
C. | Chance Nodes |
D. | All of the mentioned |
Answer» B. End Nodes |
40. | Decision Nodes are represented by ____________ |
A. | Disks |
B. | Squares |
C. | Circles |
D. | Triangles |
Answer» B. Squares |
41. | Chance Nodes are represented by __________ |
A. | Disks |
B. | Squares |
C. | Circles |
D. | Triangles |
Answer» C. Circles |
42. | End Nodes are represented by __________ |
A. | Disks |
B. | Squares |
C. | Circles |
D. | Triangles |
Answer» D. Triangles |
43. | Which of the following are the advantage/s of Decision Trees? |
A. | Possible Scenarios can be added |
B. | Use a white box model, If given result is provided by a model |
C. | Worst, best and expected values can be determined for different scenarios |
D. | All of the mentioned |
Answer» D. All of the mentioned |
44. | Decision table made up of section. |
A. | Condition statement |
B. | Condition statements |
C. | Action statements |
D. | All of these |
Answer» D. All of these |
45. | __________ is a graphic representation of system that shows data flows to from and within system, processing functions that change the data in some manner and storage of tis data. |
A. | DFD |
B. | ER model |
C. | Decision table |
D. | Decision Tree |
Answer» A. DFD |
46. | DFD shows how things happen or the physical component is called ———— |
A. | Logical DFD |
B. | Physical DFD |
C. | Data dictionary |
D. | None of these |
Answer» A. Logical DFD |
47. | A relational database system needs to maintain data about the relations, such as the schema of the relations. This is called |
A. | Metadata |
B. | Catalog |
C. | Log |
D. | Dictionary |
Answer» A. Metadata |
Tags
Question and answers in Introduction to Software Engineering,Introduction to Software Engineering Multiple choice questions and answers,Introduction to Software Engineering Important MCQs,Solved MCQs for Introduction to Software Engineering,Introduction to Software Engineering MCQs with answers PDF download