1. | the art of driving piles into the ground was first established by______. |
A. | Greeks |
B. | Romans |
C. | Philippians |
D. | None of the mentioned |
Answer» B. Romans |
2. | based on the function, piles can be classified into ______ types. |
A. | 4 |
B. | 6 |
C. | 8 |
D. | 3 |
Answer» C. 8 |
3. | which of the following piles is used to compact loose granular soil? |
A. | Friction piles |
B. | End bearing piles |
C. | Compaction Piles |
D. | Tension Piles |
Answer» C. Compaction Piles |
4. | sheet piles are commonly used as ________ in hydraulic structure. |
A. | Bulk heads |
B. | Bearing Stratum |
C. | Boulders |
D. | Composite piles |
Answer» A. Bulk heads |
5. | the piles that are used for protecting structures from ships and floating object is _______. |
A. | Anchor piles |
B. | Fender piles |
C. | Compaction Piles |
D. | Batter Piles |
Answer» B. Fender piles |
6. | Modern pile driving method was first invented by ________. |
A. | Romans |
B. | Nasmyth |
C. | Terzaghi |
D. | Vitruvious |
Answer» B. Nasmyth |
7. | the precast concrete piles are generally used for a maximum design load of about _______. |
A. | 50 tonnes |
B. | 100 tonnes |
C. | 75 tonnes |
D. | 80 tonnes |
Answer» D. 80 tonnes |
8. | cast in situ piles may be classified in to_______. |
A. | Three |
B. | Eight |
C. | Two |
D. | Four |
Answer» C. Two |
9. | which of the following piles is a cast in situ type of concrete pile? |
A. | Under reamed pile |
B. | Raymond standard pile |
C. | Pressure pile |
D. | Anchor pile |
Answer» B. Raymond standard pile |
10. | composite piles are suitable for ______. |
A. | Maximum design load |
B. | Project above the water table |
C. | Compacting the soil |
D. | Protect water front structures |
Answer» B. Project above the water table |
11. | piles are commonly driven in to the ground by means of special device called _______. |
A. | Pile driver and hammer |
B. | Driller |
C. | None of the mentioned |
D. | All of the mentioned |
Answer» A. Pile driver and hammer |
12. | the types of hammer used for driving piles are _______. |
A. | Drop hammer |
B. | Diesel hammer |
C. | Vibratory hammer |
D. | All of mentioned |
Answer» D. All of mentioned |
13. | if a hammer is raised by stem and allowed to fall by gravity on top of the pile, it is called as ______. |
A. | Diesel hammer |
B. | Vibratory hammer |
C. | Single acting hammer |
D. | Drop hammer |
Answer» C. Single acting hammer |
14. | single acting hammers provide an advantage in _______ type of soil. |
A. | Compact soil and hard soil |
B. | Light weight soil |
C. | None of the mentioned |
D. | All of the mentioned |
Answer» A. Compact soil and hard soil |
15. | a ______ is defined as a temporary structure which is constructed so as to remove water and/or soil from an area and make it possible to carry on the construction work under reasonably dry conditions. |
A. | Cofferdam |
B. | Foundation |
C. | Caisson |
D. | Spillway |
Answer» A. Cofferdam |
16. | a ______ is an embankment of some material. |
A. | Wall |
B. | Intrusion |
C. | Dike |
D. | Rock-fill |
Answer» C. Dike |
17. | _______ is the simplest form of cofferdam. |
A. | Single wall cofferdam |
B. | Earth fill cofferdam |
C. | Cellular cofferdam |
D. | Rock fill Cofferdam |
Answer» B. Earth fill cofferdam |
18. | ______ type of cofferdam is economical at places where rock is available in plenty. |
A. | Earth dikes |
B. | Sand bag Dikes |
C. | Rock fill cofferdam |
D. | Single wall cofferdam |
Answer» C. Rock fill cofferdam |
19. | in _____ type of cofferdam consists of a mixture of sand and clay which is filled in a bag and placed instead of earth or rock to form a cofferdam. |
A. | Cellular cofferdam |
B. | Earth dikes |
C. | Rock dikes |
D. | Sand bag dikes |
Answer» D. Sand bag dikes |
20. | ______ it suitable when available working space is limited and the area to be enclosed is small. |
A. | Single wall cofferdam |
B. | Double wall cofferdam |
C. | Dikes |
D. | Concrete cofferdam |
Answer» A. Single wall cofferdam |
21. | when the area to be enclosed is large, it becomes essential to provide the ______ construction so as to give stability to the cofferdam. |
A. | Single wall cofferdam |
B. | Cellular cofferdam |
C. | Double wall cofferdam |
D. | Suspended cofferdam |
Answer» C. Double wall cofferdam |
22. | _______ is useful when depth of water is about 6 meters to 10 meters. |
A. | Wood or steel sheeting cofferdam |
B. | Ohio river type cofferdam |
C. | Rock filled crib cofferdam |
D. | Suspended cofferdam |
Answer» A. Wood or steel sheeting cofferdam |
23. | the ______ is made of steel sheet piles and this type of cofferdam is proved successful in unwatering large areas. |
A. | Suspended cofferdam |
B. | Cellular cofferdam |
C. | Dikes |
D. | Concrete cofferdam |
Answer» B. Cellular cofferdam |
24. | a ______ consist of timber cribs. |
A. | Cellular cofferdam |
B. | Suspended cofferdam |
C. | Rock filled crib cofferdam |
D. | Concrete cofferdam |
Answer» C. Rock filled crib cofferdam |
26. | ______ are the cofferdams which can be lifted, floated and placed in another position as soon as its purpose is served. |
A. | Suspended cofferdam |
B. | Double wall cofferdam |
C. | Dike cofferdam |
D. | Single wall cofferdam |
Answer» A. Suspended cofferdam |
27. | a _____ is define as a structure which is sunk through ground or water to exclude water and semi fluid material during the process of excavation of foundations. |
A. | Cofferdam |
B. | Caisson |
C. | Well |
D. | Pit |
Answer» B. Caisson |
28. | the ______ is suitable for caissons of open well type. |
A. | Steel |
B. | Timber |
C. | Reinforced cement concrete |
D. | Cast-iron |
Answer» D. Cast-iron |
29. | the ______ is suitable for caisson shoes. |
A. | Reinforced cement concrete |
B. | Cast iron |
C. | Timber |
D. | Steel |
Answer» A. Reinforced cement concrete |
30. | the ______ is found to be the most suitable material for the construction of caisson. |
A. | Timber |
B. | Cast iron |
C. | Steel |
D. | RCC |
Answer» C. Steel |
31. | the ______ was used as a material for the construction of caisson in the early stages of development of caisson. |
A. | Steel |
B. | Timber |
C. | Cast iron |
D. | RCC |
Answer» B. Timber |
32. | a _____ caisson is open at top and closed at bottom. |
A. | Wells |
B. | Pneumatic caissons |
C. | Cylinders |
D. | Box caissons |
Answer» D. Box caissons |
33. | a ______ is a caisson which is open at top as well as at bottom. |
A. | Well |
B. | Box caisson |
C. | Pneumatic caissons |
D. | Cofferdam |
Answer» A. Well |
34. | a _____ are open at bottom and closed at top. |
A. | Cylinders |
B. | Wells |
C. | Box caissons |
D. | Pneumatic caissons |
Answer» D. Pneumatic caissons |
35. | which the given method is used for dewatering of the foundation trenches. |
A. | Deep boring |
B. | Geophysical method |
C. | Well point system |
D. | Analytical method |
Answer» C. Well point system |
36. | in case of releasing artesian pressure, which precaution should be taken when the system of well points is adopted. |
A. | Pumping rate |
B. | Air locks |
C. | Duplication of pumps |
D. | Blowing action |
Answer» D. Blowing action |
37. | the organic chemicals include epoxy resin, polyester resin and other resins are used in which method of dewatering of the foundation trenches. |
A. | Well point system |
B. | Cement grouting |
C. | Chemical grouting |
D. | Electro osmosis process |
Answer» C. Chemical grouting |
38. | from given below, which method for the dewatering of foundation trenches is portable and can be easily moved when required. |
A. | Pumping |
B. | Well point system |
C. | Freezing process |
D. | Electro osmosis process |
Answer» A. Pumping |
39. | in which method a refrigeration plan of required capacity is need to be installed near the site of work. |
A. | Pumping |
B. | Well point system |
C. | Freezing process |
D. | Electro osmosis process |
Answer» C. Freezing process |
40. | ______ process consists of making a number of holes in the ground and then filling these holes by the cement grout under pressure. |
A. | Chemical grouting |
B. | Cement grouting |
C. | Freezing process |
D. | Electro osmosis process |
Answer» B. Cement grouting |
41. | the formwork from the sides of beams can be removed only after |
A. | 1 day |
B. | 4 days |
C. | 7 days |
D. | 14 days |
Answer» A. 1 day |
42. | the form work from the underside of slabs, can be removed only after |
A. | 1 day |
B. | 4 days |
C. | 7 days |
D. | 14 days |
Answer» C. 7 days |
43. | the arrangement of supporting an existing structure by providing supports underneath, is known as |
A. | Shoring |
B. | Underpinning |
C. | Jacking |
D. | Piling |
Answer» B. Underpinning |
44. | a temporary rigid structure having platforms to enable masons to work at different stages of a building, is known as |
A. | Scaffolding |
B. | Dead shore |
C. | Raking shore |
D. | Underpinning |
Answer» A. Scaffolding |
45. | pyramid is a type of ______ structure. |
A. | Triangulated |
B. | Massive |
C. | Pneumatic |
D. | Framed |
Answer» B. Massive |
46. | Pneumatic structure contains: |
A. | Metal |
B. | Water |
C. | Wood |
D. | Compressed air |
Answer» D. Compressed air |
47. | _______ is a self-propelled machine which is used mainly to exert a powerful tractive force for pulling other machines. |
A. | Tractor |
B. | Bulldozer |
C. | Angle dozer |
D. | Scraper |
Answer» A. Tractor |
48. | a ______ is a very useful equipment and it can be used for construction work like to clear the site of work, to make the land level, etc. |
A. | Scraper |
B. | Grader |
C. | Excavator |
D. | Bulldozer |
Answer» D. Bulldozer |
49. | the size of the bulldozer is indicated by the dimension of its ______ |
A. | Site |
B. | Tyre |
C. | Engine |
D. | Blades |
Answer» D. Blades |
51. | a ______ is used to level the ground and spreads the loose material. |
A. | Excavator |
B. | Scraper |
C. | Grader |
D. | Tractor |
Answer» C. Grader |
52. | a grader which is told by a tractor is known as _________. |
A. | Tractor grader |
B. | Motor grader |
C. | Scraper |
D. | Elevating grader |
Answer» D. Elevating grader |
53. | _______ consists of a large bucket which is attached to a tractor. |
A. | Bulldozer |
B. | Scraper |
C. | Grader |
D. | Escalator |
Answer» B. Scraper |
54. | ______ are usually mounted on two or four pneumatic tyred wheels. |
A. | Scraper |
B. | Backactor |
C. | Elevator |
D. | Escalator |
Answer» A. Scraper |
55. | a ______ is an oldest type of machine which removes earth. |
A. | Escalator |
B. | Excavator |
C. | Elevator |
D. | Bulldozer |
Answer» B. Excavator |
56. | ______ type of excavator used for digging the foundation trenches below operating level. |
A. | Clamshell |
B. | Backactor |
C. | Power shovel |
D. | Skimmer |
Answer» B. Backactor |
57. | ______ type of excavator is used for digging below, at or above operating level in a vertical range. |
A. | Skimmer |
B. | Dragline |
C. | Clamshell |
D. | Back trench |
Answer» C. Clamshell |
58. | _______ type of excavator carries shovel at its lower end. |
A. | Power shovel |
B. | Dragline |
C. | Clamshell |
D. | Backactor |
Answer» A. Power shovel |
59. | ______ type of excavator is used for digging at or below the operating level. |
A. | Skimmer |
B. | Dragline |
C. | Power shovel |
D. | Dredger |
Answer» B. Dragline |
60. | ______ type of excavator carries the skimmer at its lower end. |
A. | Skimmer |
B. | Dredger |
C. | Escalator |
D. | Elevator |
Answer» A. Skimmer |
61. | a _____ roller is a multi-purpose roller which is used for various purposes and for practically all type of roads. |
A. | Smooth wheeled |
B. | Pneumatic |
C. | Rubber tyred |
D. | Dead weight |
Answer» A. Smooth wheeled |
62. | effective compaction is not achieved by ________. |
A. | Rubber tyred |
B. | Sheep’s foot |
C. | Pneumatic |
D. | Smooth wheeled |
Answer» D. Smooth wheeled |
63. | ______ consists of a vibrating unit mounted on a screed, plate or roller. |
A. | Earth rammer |
B. | Pounding |
C. | Vibrating rollers |
D. | Vibratory compactors |
Answer» D. Vibratory compactors |
64. | the ______ compact soil close to the earth surface only. |
A. | Earth rammers |
B. | Vibrating rollers |
C. | Ditcher |
D. | Skimmer |
Answer» A. Earth rammers |
65. | ______ are the most commonly used equipment for transportation. |
A. | Dump tracks |
B. | Rollers |
C. | Trucks |
D. | Bulldozers |
Answer» C. Trucks |
66. | the trucks with automatic unloading device are called ______. |
A. | Dumpers |
B. | Trailers |
C. | Conveyor |
D. | Dump tracks |
Answer» D. Dump tracks |
67. | ______ are very useful for horizontal transportation of materials like bricks, aggregates, scaffoldings, etc. |
A. | Elevators |
B. | Escalators |
C. | Dumpers |
D. | Conveyors |
Answer» C. Dumpers |
68. | ______ are extra wagons attached to the tractors or trucks. |
A. | Elevators |
B. | Conveyors |
C. | Trailers |
D. | Dumper |
Answer» C. Trailers |
69. | ______ are used for vertical transportation of aggregate and wet concrete on large project sites. |
A. | Elevators |
B. | Trucks |
C. | Conveyors |
D. | Escalators |
Answer» A. Elevators |
70. | in order to raise and shift heavy loads from one place to another, they ______ are employed in the construction of big works. |
A. | Elevators |
B. | Conveyors |
C. | Cranes |
D. | Trucks |
Answer» C. Cranes |
71. | ______ crane is used for open sites and it possesses a very long reach. |
A. | Goliath |
B. | Derrick |
C. | Swing jib |
D. | Cable |
Answer» B. Derrick |
72. | in ______ type of crane, heavy temporary staging or platform is prepared for the working of the crane. |
A. | Cableways |
B. | Swing jib |
C. | Goliath |
D. | Platform |
Answer» C. Goliath |
73. | ______ are cranes of swing jib type and are mounted on high steel towers. |
A. | Cableways |
B. | Swing jib |
C. | Tower |
D. | Goliath |
Answer» C. Tower |
74. | the removal of earth for highway formation is ______. |
A. | Embankment |
B. | Sub grade |
C. | Excavation |
D. | Filling |
Answer» C. Excavation |
76. | what is the equipment used for short haul distance of 100 m? |
A. | Bulldozer |
B. | Scrapper |
C. | Power shovel |
D. | Hoe |
Answer» A. Bulldozer |
77. | the blade angle of bulldozer is usually ______. |
A. | 60 |
B. | 90 |
C. | 15 |
D. | 45 |
Answer» B. 90 |
78. | the precise control of excavation is possible by _______. |
A. | Scrapper |
B. | Hoe |
C. | Shovel |
D. | Bulldozer |
Answer» A. Scrapper |
79. | the boom is supported by _______. |
A. | Cab |
B. | Dipper stick |
C. | Hoist line |
D. | Crawler |
Answer» C. Hoist line |
80. | dragline cannot excavate _______. |
A. | Soft rock |
B. | Black cotton soil |
C. | Clay |
D. | Stiff material |
Answer» D. Stiff material |
81. | the stiff materials can be excavated by ______. |
A. | Dragline |
B. | Hoe |
C. | Power shovel |
D. | Scrapper |
Answer» B. Hoe |
82. | the equipment having a bucket is? |
A. | Shovel |
B. | Clam shell |
C. | Dragline |
D. | Hoe |
Answer» B. Clam shell |
83. | the compaction of sand is done by ______. |
A. | Rollers |
B. | Animals |
C. | Vibrator |
D. | Jetting |
Answer» D. Jetting |
84. | the term _____ is used to indicate the process of allocating a prepaid expense to accounting periods during which there are benefits realized from the depreciable equipment. |
A. | Cost depreciation |
B. | Investment charges |
C. | Maintenance and repair |
D. | Operating cost |
Answer» A. Cost depreciation |
85. | in ______ method, it is assumed that a property loses its value by the same amount every year. |
A. | Sinking fund |
B. | Operating cost |
C. | Constant percentage |
D. | Straight line method |
Answer» D. Straight line method |
86. | in ______ method, the depreciation of properties assumed to be equal to the annual sinking fund plus the interest on the fund for that year. |
A. | Sinking fund |
B. | Annual fund |
C. | Constant percentage |
D. | Straight line |
Answer» A. Sinking fund |
87. | in _______, the owner has to invest a certain amount for the purchase of an equipment. |
A. | Cost depreciation |
B. | Investment charges |
C. | Operation cost |
D. | Management |
Answer» B. Investment charges |
88. | the term _____ is used to indicate the period during which the equipment is not in ideal condition. |
A. | Depreciation |
B. | Downtime |
C. | Inadequacy |
D. | Normal deterioration |
Answer» B. Downtime |
Tags
Question and answers in Advanced Construction and Equipments,Advanced Construction and Equipments multiple choice questions and answers,Advanced Construction and Equipments Important MCQs,Solved MCQs for Advanced Construction and Equipments,Advanced Construction and Equipments MCQs with answers PDF download